In determining the repair priority, each gas pipeline company should consider the following criteria:(i) Amount and migration of gas;(ii) Proximity of gas to buildings and subsurface structures;(iii) Extent of pavement; and(iv) Soil type and conditions, such as frost cap, moisture and natural venting.(b) Each gas pipeline company must reevaluate Grade 2 leaks at least once every six months until c