Water from the work shall be conveyed in such a manner as not to cause any nuisance or injury to the public. (f) The Contractor shall execute the above with due consideration for full flow conditions and the execution shall be such that damages to construction works and flooding to the surrounding catchment shall be the minimum possible under the worst flood conditions. (g) The Contractor shall be