. . . . . "tion, and electrical systems; bleacher and synthetic turf field replacement; track resurfacing and/or reconditioning; reconstruction and regrading of the field event area; reconstruction of student bathrooms; parking lot resurfacing and brick repointing; all of the foregoing to include the original furnishings, equipment, machinery, apparatus and ancillary or related site and other work required i" .