. . . . . " riparian status of the land to which the water is to be diverted transferred, the location and description of the canal, tunnel or pipes and other works through which the water is to be diverted withdrawn and transferred, the amount of water to be diverted withdrawn, the periods of time when it is proposed to divert withdraw such water, the time required for the completion of the canal and other" .