. . "While the model successfully increased both the endurance and altitude of the UAV, the Air Force rejected it because of concerns with its size; increasing the wings by that much would require redesigning the infrastructure, such as hangars and shipping containers, which are already in use.Test models included versions with longer wings, but the Air Force selected a different fix: new wings, the sa" . .