"Henry, the longtime petroleum engineer and master cementer, says the place to put a neon marker on the permit application is on line 21 -- where the agency seeks the sort of information it needs to assess whether the driller is prepared to take all the steps necessary in the drilling, fracking and cementing processes to protect against a breach." . . . .