"This average is a 12 month rolling average calculated based on the data reported to the Supply Chain Coordinator by the DCs. [1958] DC/Item Growth At the DC level, the user can override the overall growth % by entering an alternate value for the relevant DC. [1959] Projected Usage The actual usage estimate for each Item/DC combination." . . . .