. . "The first station at the upstream end of the conveyor line is a loading station at which the panel P is loaded upon its support frame 28 or 28A. To accomplish this loading, the manipulator 48 at the loading station is actuated to lower the support frame to its lowered position at which the movable locating devices such as 200 are located in their disengaged position as illustrated in FIG. 5." . .