onstruction Cost. 3.2 Construction Cost does not include the compensation of the Architect and consultants, the cost of the land, rights-of-way, or other costs which are the responsibility of the Owner as provided in Paragraphs 2.3 through 2 . 6 inclusive . 3.3 Labor furnished by the Owner for the Project shall be included in the Construction Cost at current market rates including a reasonable all