Work for which no such bid or proposal is received, (1) the latest Detailed Estimate of Construction Cost if one is available, or (2) the latest Statement of Probable Construction Cost. 3.2 Construction Cost does not include the compensation of the Architect and consultants, the cost of the land, rights-of-way, or other costs which are the responsibility of the Owner as provided in Paragraphs 2.3