ost. 3.2 Construction Cost does not include the compensation of the Architect and consultants, the cost of the land, rights-of-way, or other costs which are the responsibility of the Owner as provided in Paragraphs 2.3 through 2.6 inclusive. 3.3 Labor furnished by the Owner for the Project shall be included in the Construction Cost at current market rates including a reasonable allowance for overh