However, from a (very brief) look around, that mass does not include things such as structure, cooling, power conversion, and the like, so you???re likely to be spending rather more than that; I hesitate to guess a number because I am neither a nuclear nor an aerospace engineer, let alone both, and while I do have some documentation on conceptual designs for NEP and SEP spacecraft most of it dates