Column ???A of {A,D}??? shows that a 15% increase in load will result in load flow non-solution when taken in combination with outage A. If an increase in load greater that 15% occurs, and contingency A unexpectedly is outaged due to equipment failure, maintenance, or other reason, the electrical system would be anticipated to experience voltage stability, local blackout or voltage collapse proble