Contractors shall follow the existing quality control plan that contains, at a minimum, a description of the inspection system to cover all services including areas to be inspected and the schedule of inspection, a description of the methods used for identifying and preventing defects in the quality of services and a description of the records to be kept to document inspections and any corrective/