You are right that the $452 million figure is ludicrous, but BRT ???done right??? ??? meaning with exclusive reservation, TSP, and off-board loading ??? doesn???t cost that much less than LRT. It???s maybe 60% of the cost, mostly because the vehicles are much less expensive, but in a corridor which really can support reservation, the longer trains and larger cars possible with LRT does yield somew