Code 43-02-03-27.1 (2012).OH Within 60 days after the completion of drilling or after a determination that a well is a dry or lost hole, a well completion record must be filed which designates: the trade name and the total amount of all products, fluids, and substances, and the supplier of each product, fluid, or substance???not including cement and its constituents and lost circulation materials?