Construction on the basis of assembly plans approved by the client was a very important part of the pre-assembly phase and the testing of the entire system at our workshop, which also included the construction of the tubing, electrical and pneumatic systems.This phase permitted considerable savings in assembly time and operations on site in addition to truly complete final testing conducted at our