[Note:] The original bill permitted the department of natural resources (DNR) to grant permits for the burning of brush up to 6 in diameter, without energy recovery, at a wood burning facility if the DNR concludes that energy recovery is not feasible at the area in which the brush or other material is generated and issues a permit to the wood burning facility.