These choices may also be influenced by the desired time before the delayed break, which could depend upon the size of the job, whether the job is hydraulic fracturing or gravel packing, and other factors known to those of ordinary skill in the art, including the concentrations and natures of the VES or crosslinked polymer and any other additives, and the temperature.