Other future challenges will be to: ??? Reduce the total drilling/completion days by optimizing casing designs, increasing ROP through bits or other technologies, running more permanent downhole monitoring systems but on wireline or CTU, developing smart drilling fluids. ??? Optimize workover interventions by extending the service life of tools and increasing the reliability of permanent downhole