t where the water heater is loosely placed now at the aft end of the port lazerette).Find Rob's plans for where he wanted to install things such as the batteries, water heater, etc. (I could help with scanning and copying.)After the rudder mounting is finished for certain, then hook up hoses (cockpit drain, water heater, engine cooling, engine fill, etc.) and install the water heater, and mount an