s, and is intended primarily to offset part or all of the customer's own electrical requirements on the premises.???Rule 22 describes the interconnection, operating, and metering requirements in detail for all types of generating facilities, besides NEM, generators which are limited to photovoltaic systems and wind turbines.???If you install a photovoltaic system within the City of Riverside???s s