With respect to FEMA mandated elevations for new construction in the floodplain, Special Condition 10 of the draft permit which read, Construction of buildings and other structures, as well as the bulk storage of petroleum products, which occurs beyond the floodway but within the regulatory floodplain, should be at least two feet above the base flood elevation (BFE)., was amended to read, Const