All storage tanks, apparatus and other equipment located at or above ground well sites shall be removed and abandonment completed within one hundred eighty (180) days after well stops producing commercially and the ground shall be restored to the extent possible to its original condition prior to drilling of said well, with the said one hundred eighty (180) day period. 2.