Specifically, the project manager has directed the design team to develop design alternatives that; a) orient the overall building structures furthest away from residential homes, b) incorporates structures that are roughly as tall as the adjacent homes around the property, and c) incorporates glass, metal, concrete, and other materials and features that will complement the architectural character