In Step 5, an adhesion promoter may be applied to the hard material and then the soft material is poured inside the retaining wall, or other containing device, and allowed to cure using heat, UV, or combination of heat and UV. In Step 6, the spacer, or containing device, is removed and the blank is ready for subsequent manufacturing operations.