The performance duration will not exceed 14 months (426 calendar days) beyond NTP.4.0 SECURITY: 4.1 The existing data center is a secure facility located on the 4th floor of the Technology Center and must remain operational 24x7 hours/day, 365 days/year throughout the construction of this project.