was to continue in effect as long [after the initial ten-year period] as oil, gas, sulphur or other mineral is produced . . . or so long thereafter as [respondents] shall conduct drilling or reworking operations thereon with no cessation of more than sixty (60) days consecutively until production results; and, if production results, so long as such mineral is produced.