About: isa:26645321   Sponge Permalink

An Entity of Type : prov:Entity, within Data Space : webisadb.webdatacommons.org associated with source dataset(s)

AttributesValues
rdf:type
prov:value
  • Similarly, costs related to building and construction projects, such as consulting fees and survey costs, that have not been and are not likely to be approved by the Board in the near future should be expensed when incurred, rather than included in this account. 30.40 Examples of Classification of Capitalized Bank Premises Assets The following are examples of disbursements, which are to be capital
prov:wasQuotedFrom
is prov:wasDerivedFrom of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software