In my situation the substation building is being located adjacent two exsting buildings and is in the middle of a large multi-building site.The summary from the BS EN's and other documents seems to recongnise on constrained site locations, urban locations etc it is unlikely that physical below ground space needed for the seperation of the HV/LV will be possible, therefore combined earthing will be