An agent may limit the time period during which a system can be constructed to ensure that soil conditions, weather, groundwater, or other conditions do not adversely affect the reliability of the system. (15) Permit requirements: (a) A person may not cause or allow construction, alteration, or repair of a system or any part thereof without a WPCF permit issued under OAR 340-071-0162 or a construc