There would be a lot of transportation value in allowing Amtrak and Metrolink trains onto the HSR tracks when they are not being fully utilized, but these operators would probably also have to switch to lightweight, i.e. non-compliant, equipment first to avoid damaging the HSR tracks over time.The trouble is that neither Amtrak nor Metrolink have the funding they need to implement PTC throughout th