Hi Gurus, Can any one explain me in details how the SAP PM and SAP MM are integrated?Also can I have the MRP integration with the SAP PM, I mean when I create a work order I mention the components that are required for example 100 nuts and bolts, is there a link in SAP PM and SAP MM to the resource planning of the items to be used in the maintenance and if the nuts and bolts are not there can I ru