The primary system includes engineered safeguard systems, ESS including chemical and volume control system CVCS, safety injection system SIS, residual heat removal system RHRS, containment spray and fan cooling system CSP, and an accumulator discharge system (not shown) which is described in detail in connection with the description of the individual models.