The site for Blythe II is 76 acres next to the operating Blythe Energy Project Phase I. While Blythe I is owned by Florida Power and Light, Blythe II is proposed by a separate company, Caithness Blythe II, LLC. Still, the two power plants could share some facilities, such as control, administration and maintenance buildings, a surface-water-runoff-retention basin and access road.