(2) Where another facility, such as a highway or waterway, requiring a bridge structure is located within the limits of a grade separation project, the estimated cost of a theoretical structure and approaches as described in ??646.210(c)(1) to eliminate the railroad-highway grade crossing without considering the presence of the waterway or other highway.