The backfilling material is capable of obtaining an initial unconfined compressive strength of the order of about 20 psi within about four (4) hours so that a wearing course can be placed to reopen the roadway to traffic, the backfilling material also being able to withstand other types of compressive loading such as where structures are built thereover including buildings, bridge abutments, emban