Surrounding a lagoon in the center of the public property, 19 of the park???s 24 acres required irrigation.Jeff Bowman, project engineer and designer, Irrigation Consulting, Inc., directed the elaborate design. ???The vision was to help improve the conditions including the quality and design of the turf, and to reduce the labor and maintenance attributed to irrigation,??? he said. ???We also sough