easures to be taken to comply with section 49; and(b) any studies, reports, analyses or other material on which the information submitted pursuant to section 70 and 76 are based.(3) Where Foothills conducts studies or gathers data or information when considering the effect, if any, of the construction or operation of the pipeline on the existing or potential use of any land or waterbody through wh