Design and construction issues will be presented including specific examples such as: the king pile toe wall which was required to allow berth deepening; bracing the existing timber piles supporting the waterside crane beam where the beam was to be retained; the new waterside and landside crane beams which needed to be installed without impacting adjacent structures; the fender system and the conc