General permit 20 does not authorize the channelization of a stream or the stabilization of the bottom of the stream. (b) The applicant shall use vegetative or bioengineering stabilization methods unless the applicant demonstrates that, based on the velocity and configuration of the channel or other factors, the Standards for Soil Erosion and Sediment Control in New Jersey at N.J.A.C. 2:90 require