However, there is a trade-off that must be made because if the length is too great, the time required to complete the wheel correction algorithm is too long and/or the amount of curvature and grade in the track segment over which the data is to be taken preclude running the algorithm over too much track in the system In some embodiments, the predetermined length of track is 100,000 meters.