(e) Between 2015 and 2016: A new A-pier at the Main Terminal's south end is to serve 3M passengers per annum and is to accommodate 8 aircraft including space for wide-bodied planes. (d) Departure Lounge 2 refurbishment started in Fall 2014 and will be done by 2018.