Falsework and Vertical Shoring. (a) Design Loads. (1) Formwork and falsework or shoring for the support of concrete or other materials shall be designed, erected, supported, braced and maintained so as to assure its ability to safely withstand all intended loads during erection, construction, usage and removal. (2) The minimum total design load for any formwork and shoring shall be not less than 1