at the city, county, district, or other agency shall supervise and regulate the design, construction, operation enlargement, replacement, and removal of the ponds after the effective date of the resolution. (c) This section applies only to ponds specified in subdivision (a) which (1) have a maximum height of 15 feet or less and a maximum storage capacity of 1,500 acre-feet or less, (2) have been d