prov:value
| - (b) In this subsection estimated reasonable costs" include the costs of preliminary planning to determine the economic and engineering feasibility of a proposed sewerage system, the engineering, architectural, legal, fiscal and economic investigations and studies, surveys, designs, plans, working drawings, specifications, procedures and other action necessary to the construction of the project an
|