If at any time before completion of the works, any part of the works or any materials, plant or equipment whether incorporated in the works or not are damaged or destroyed, resulting in additional work being required by the client to be carried out by the consulting engineer, then the consulting engineer shall be paid by the client on a time basis (i.e. salary cost times a multiplier) for the addi