he pavement, and the Method Statement for carrying out the work, detailing all the activities including indication of time-cycle, equipment, personnel etc., shall be got approved from the Engineer before the commencement of the work, The above shall include the type, capacity and make of the batching and mixing plant besides the hauling arrangement and paving equipment.